Monday saw the start of the Hayes Lane pitch renovation.

Fraze mowing was the first step. This process removes the top layer of the current pitch which helps remove any detrimental materials that have built up over the footballing season to help create a better environment for grass strength.

Multivating then takes place helping to recycle existing soil, aerate and de-compact the surface before 80 tonnes of sand is mixed into the surface assisting with the releveling of the pitch.

A big shout out to Ian and his team (Jordans Sports Ground Solutions Ltd) for their work. Click here to view their website>

ground2 ground1ground3

SHARE